This video shows the process of the construction of a treatment plant with the capacity of 800m³ per day. Construction begins with the building of concrete tanks. The next stage – the installation of a staff building. At the same time technological equipment (walls, pipes, aerators and airlifts) is placed in the concrete tanks. At the final stage, the setup of the equipment and automation systems as well as the connection to the SCADA-system.
Today our company can design and implement wastewater treatment capacity of up to 50 000m³ per day subject to our customers’ specification.